Article 10 Application
Exhibit 1: General Requirements
Exhibit 2: Overview and Public Involvement
Exhibit 3: Location of Facilities
Exhibit 4: Land Use
Exhibit 5: Electric System Effects
Exhibit 6: Wind Power Facilities
Exhibit 7: Natural Gas Power Facilities
Exhibit 8: Electric System Production Modeling
Exhibit 9: Alternatives
Exhibit 10: Consistency with Energy Planning Objectives
Exhibit 11: Preliminary Design Drawings
Exhibit 12: Construction
Exhibit 13: Real Property
Exhibit 14: Cost of Facilities
Exhibit 15: Public Health & Safety
Exhibit 16: Pollution Control Facilities
Exhibit 17: Air Emissions
Exhibit 18: Safety and Security
Exhibit 19: Noise and Vibration
Exhibit 20: Cultural Resources
Exhibit 21: Geology, Seismology, and Soils
Exhibit 22: Terrestrial Ecology and Wetlands
Exhibit 23: Water Resources and Aquatic Ecology
Exhibit 24: Visual Impacts
Exhibit 25: Effect on Transportation
Exhibit 26: Effect on Communications
Exhibit 27: Socioeconomic Effects
Exhibit 28: Environmental Justice
Exhibit 29: Site Restoration and Decommissioning
Exhibit 30: Nuclear Facilities
Exhibit 31: Local Laws and Ordinances
Exhibit 32: State Law and Regulations
Exhibit 33: Other Applications and Filings
Exhibit 34: Electric Interconnection
Exhibit 35: Electric and Magnetic Fields
Exhibit 36: Gas Interconnection
Exhibit 37: Back-Up Fuel
Exhibit 38: Water Interconnection
Exhibit 39: Wastewater Interconnection
Exhibit 40: Telecommunications Interconnection
Exhibit 41: Applications to Modify or Build Adjacent
Exhibit 2: Overview and Public Involvement
Exhibit 3: Location of Facilities
Exhibit 4: Land Use
Exhibit 5: Electric System Effects
Exhibit 6: Wind Power Facilities
Exhibit 7: Natural Gas Power Facilities
Exhibit 8: Electric System Production Modeling
Exhibit 9: Alternatives
Exhibit 10: Consistency with Energy Planning Objectives
Exhibit 11: Preliminary Design Drawings
Exhibit 12: Construction
Exhibit 13: Real Property
Exhibit 14: Cost of Facilities
Exhibit 15: Public Health & Safety
Exhibit 16: Pollution Control Facilities
Exhibit 17: Air Emissions
Exhibit 18: Safety and Security
Exhibit 19: Noise and Vibration
Exhibit 20: Cultural Resources
Exhibit 21: Geology, Seismology, and Soils
Exhibit 22: Terrestrial Ecology and Wetlands
Exhibit 23: Water Resources and Aquatic Ecology
Exhibit 24: Visual Impacts
Exhibit 25: Effect on Transportation
Exhibit 26: Effect on Communications
Exhibit 27: Socioeconomic Effects
Exhibit 28: Environmental Justice
Exhibit 29: Site Restoration and Decommissioning
Exhibit 30: Nuclear Facilities
Exhibit 31: Local Laws and Ordinances
Exhibit 32: State Law and Regulations
Exhibit 33: Other Applications and Filings
Exhibit 34: Electric Interconnection
Exhibit 35: Electric and Magnetic Fields
Exhibit 36: Gas Interconnection
Exhibit 37: Back-Up Fuel
Exhibit 38: Water Interconnection
Exhibit 39: Wastewater Interconnection
Exhibit 40: Telecommunications Interconnection
Exhibit 41: Applications to Modify or Build Adjacent
Figure 2-1: Project Area and Study Area
Figure 2-2: Defined Areas
Figure 3-1: Project Component Locations
Figure 3-2: Article VII Transmission Line Location
Figure 4-1: Existing Land Use
Figure 4-2: Existing Utility Locations
Figure 4-3: Tax Parcels
Figure 4-4: Town of Alfred Zoning Map
Figure 4-5: Specially Designated Areas
Figure 4-6: Recreational and Other Sensitive Land Uses
Figure 4-7: Aerial Photography of the Project Area
Figure 6-1: Turbine Setbacks
Figure 9-1: Project Areas and Alternate Turbine Sites
Figure 13-1: Real Property Map of Generating Site and Interconnection Facilities
Figure 15-1: Public Health and Safety
Figure 15-2: Receptor Locations
Figure 19-1: Noise Monitor Locations
Figure 21-1: Slope
Figure 21-2: Soil Types
Figure 21-3: Bedrock
Figure 22-1: Impacts to Plant Communities
Figure 22-2: Delineated Wetlands
Figure 22-3: Mapped Wetlands
Figure 23-1: Ground Water Aquifers and Recharge Areas
Figure 23-2: Surface Waters
Figure 26-1: Communication System Restraints
Figure 28-1: Potential Environmental Justice Areas
Figure 2-2: Defined Areas
Figure 3-1: Project Component Locations
Figure 3-2: Article VII Transmission Line Location
Figure 4-1: Existing Land Use
Figure 4-2: Existing Utility Locations
Figure 4-3: Tax Parcels
Figure 4-4: Town of Alfred Zoning Map
Figure 4-5: Specially Designated Areas
Figure 4-6: Recreational and Other Sensitive Land Uses
Figure 4-7: Aerial Photography of the Project Area
Figure 6-1: Turbine Setbacks
Figure 9-1: Project Areas and Alternate Turbine Sites
Figure 13-1: Real Property Map of Generating Site and Interconnection Facilities
Figure 15-1: Public Health and Safety
Figure 15-2: Receptor Locations
Figure 19-1: Noise Monitor Locations
Figure 21-1: Slope
Figure 21-2: Soil Types
Figure 21-3: Bedrock
Figure 22-1: Impacts to Plant Communities
Figure 22-2: Delineated Wetlands
Figure 22-3: Mapped Wetlands
Figure 23-1: Ground Water Aquifers and Recharge Areas
Figure 23-2: Surface Waters
Figure 26-1: Communication System Restraints
Figure 28-1: Potential Environmental Justice Areas
Appendix 2-1: GE 3 MW Brochure
Appendix 2-2: GE 2 MW Brochure
Appendix 2-3: PIP Meeting Log
Appendix 2-4: Stakeholders List
Appendix 5-1. System Reliability Impact Study-Confidential Insert-Redacted
Appendix 5-2: Transmission Line Design Criteria-Confidential Insert-Redacted
Appendix 5-3: Substation Design Criteria-Confidential Insert-Redacted
Appendix 5-4: Mechanical Load Analysis-Confidential Insert-Redacted
Appendix 5-5: NEER Major Duties and Accountability Matrix
Appendix 5-6: Wind Project Construction Quality Program
Appendix 5-7: Wildlife Response and Reporting System Summary
Appendix 5-8: Transmission Line Vegetation Clearing Drawings
Appendix 5-9: Collection Line Vegetation Clearing Drawings
Appendix 5-10. Vegetation Management Operations Manual
Appendix 6-1: Wind Resource Assessment Report-Confidential Insert-Redacted
Appendix 8-1: Eight Point Wind ICF Assessment-Confidential Insert-Redacted
Appendix 11-1: Sample 32 ft Patrick and Henderson Foundation Drawing (GE 2.5 MW)
Appendix 11-2: Sample 32 ft Patrick and Henderson Foundation Drawing (GE 3.4 MW)
Appendix 11-3: General Index and Details
Appendix 11-4: Turbine Sites and Access Roads
Appendix 11-5: Collection Systems Routes
Appendix 11-6: Marking and Lighting Layout
Appendix 11-7: Collection Substation Lighting Plan
Appendix 12-1: Underground Utility Crossing Drawings and Details
Appendix 12-2: Complaint Resolution Plan
Appendix 13-1: Surveys of Properties Purchased by Applicant
Appendix 13-2: Examples of Standard Agreements
Appendix 14-1: Estimated Cost of Facilities-Confidential Insert-Redacted
Appendix 15-1: Shadow Flicker Report
Appendix 18-1: Emergency Action Plan
Appendix 18-2: Site Development Health and Safety Plan
Appendix 19-1: Pre-Construction Noise Impact Assessment
Appendix 19-2: Sound Monitoring and Complaint Resolution Plan
Appendix 20-1: Phase 1A-1B Archaeological Survey Report-Confidential Insert-Redacted
Appendix 20-2: Historic Architecture Reconnaissance Survey
Appendix 20-3: NYS OPRHP Correspondence
Appendix 20-4: Archaeological Survey Report Addendum-Confidential Insert-Redacted
Appendix 21-1: Inadvertent Return Plan
Appendix 21-2: Preliminary Geotechnical Investigation Report Wind Turbines and Transmission Line
Appendix 21-3: Preliminary Blasting Plan
Appendix 21-4: Substation and Operations and Maintenance Building Geotechnical Report
Appendix 21-5: Preliminary Thermal Resistivity Testing Report
Appendix 21-6: Desktop Geotechnical Report
Appendix 22-1: Master Plant Inventory List
Appendix 22-2: Wetland and Waterbody Delineation Report Appendix 22-2: Wetland and Waterbody Delineation Report-_Waterbody Data Forms Appendix 22-2: Wetland and Waterbody Delineation Report_Wetland Data Forms Appendix 22-3: Invasive Species Control Plan Appendix 22-4: Master Wildlife Inventory List Appendix 22-5: 2016 Pre-Construction Avian and Bat Surveys Appendix 22-6: 2016 Pre-Construction Spring Migrating Bird Report Appendix 22-7: Phase 3 Bat Mist Net and Acoustic Survey Appendix 22-8: Habitat Assessment Memorandum Appendix 22-9: Habitat Fragmentation Memorandum Appendix 22-10: Cumulative Effects Analysis Appendix 22-11: Agency Consultation Packages Appendix 22-12: Wetland Functions and Values Assessment Appendix 22-13: NYSDAM Wind Farm Guidelines Appendix 23-1: NYSDEC Obtained Water Well Reports Appendix 23-2: NYSDEC FOIL Correspondence Appendix 23-3: Water Well Survey and Responses Appendix 23-4: Preliminary Stormwater Pollution Prevention Plan Appendix 23-5: Preliminary Spill Prevention, Control, and Countermeasure Plan Appendix 24-1: VIA Attachment 1 – Figure 7 Appendix 24-1: VIA Attachment 1 – Figure 8 Appendix 24-1: VIA Attachment 1 – Figures 1 through 6 Appendix 24-1: VIA Attachment 2 – Simulations Appendix 24-1: VIA Attachment 3 – Outreach Correspondence Appendix 24-1: VIA Attachment 4 – Visual Impact Rating Forms Appendix 24-1: Visual Impact Assessment VIA Appendix 25-1: Turbine Delivery Route Analysis Appendix 25-2: Public Road Study Appendix 25-3: Accident Summary Data 2014-2016 Appendix 25-4: School Bus Route Map Appendix 25-5: Summary of Expected Construction Vehicles Appendix 25-6: Airspace Analysis Appendix 25-7: Notice of Presumed Hazard and Public Notice circularization Appendix 26-1: AM and FM Radio Report Appendix 26-2: Off-Air TV Analysis Appendix 26-3: Mobile Phone Carrier Report Appendix 26-4: Microwave Study Appendix 26-5: Land Mobile and Emergency Services Report Appendix 26-6: Doppler Weather Radar Study Appendix 26-7: National Telecommunications and Information Administration Response Appendix 26-8: GPS Study Appendix 26-9: Amateur Radio Report Appendix 29-1: Decommissioning & Restoration Plan Appendix 31-1: Local Law No. 1 of 2017 Greenwood Wind Energy Facilities Appendix 31-2: Local Law No. 1 of 2017 West Union Wind Energy Facilities Appendix 31-3: Local Law No. 1 of 2012 West Union Land Use-Site Planning Appendix 34-1: Collection Line Structure Drawings Appendix 34-2: Transmission Line Structure Drawings Appendix 35-1: Electric and Magnetic Field Calculation Report
Appendix 2-2: GE 2 MW Brochure
Appendix 2-3: PIP Meeting Log
Appendix 2-4: Stakeholders List
Appendix 5-1. System Reliability Impact Study-Confidential Insert-Redacted
Appendix 5-2: Transmission Line Design Criteria-Confidential Insert-Redacted
Appendix 5-3: Substation Design Criteria-Confidential Insert-Redacted
Appendix 5-4: Mechanical Load Analysis-Confidential Insert-Redacted
Appendix 5-5: NEER Major Duties and Accountability Matrix
Appendix 5-6: Wind Project Construction Quality Program
Appendix 5-7: Wildlife Response and Reporting System Summary
Appendix 5-8: Transmission Line Vegetation Clearing Drawings
Appendix 5-9: Collection Line Vegetation Clearing Drawings
Appendix 5-10. Vegetation Management Operations Manual
Appendix 6-1: Wind Resource Assessment Report-Confidential Insert-Redacted
Appendix 8-1: Eight Point Wind ICF Assessment-Confidential Insert-Redacted
Appendix 11-1: Sample 32 ft Patrick and Henderson Foundation Drawing (GE 2.5 MW)
Appendix 11-2: Sample 32 ft Patrick and Henderson Foundation Drawing (GE 3.4 MW)
Appendix 11-3: General Index and Details
Appendix 11-4: Turbine Sites and Access Roads
Appendix 11-5: Collection Systems Routes
Appendix 11-6: Marking and Lighting Layout
Appendix 11-7: Collection Substation Lighting Plan
Appendix 12-1: Underground Utility Crossing Drawings and Details
Appendix 12-2: Complaint Resolution Plan
Appendix 13-1: Surveys of Properties Purchased by Applicant
Appendix 13-2: Examples of Standard Agreements
Appendix 14-1: Estimated Cost of Facilities-Confidential Insert-Redacted
Appendix 15-1: Shadow Flicker Report
Appendix 18-1: Emergency Action Plan
Appendix 18-2: Site Development Health and Safety Plan
Appendix 19-1: Pre-Construction Noise Impact Assessment
Appendix 19-2: Sound Monitoring and Complaint Resolution Plan
Appendix 20-1: Phase 1A-1B Archaeological Survey Report-Confidential Insert-Redacted
Appendix 20-2: Historic Architecture Reconnaissance Survey
Appendix 20-3: NYS OPRHP Correspondence
Appendix 20-4: Archaeological Survey Report Addendum-Confidential Insert-Redacted
Appendix 21-1: Inadvertent Return Plan
Appendix 21-2: Preliminary Geotechnical Investigation Report Wind Turbines and Transmission Line
Appendix 21-3: Preliminary Blasting Plan
Appendix 21-4: Substation and Operations and Maintenance Building Geotechnical Report
Appendix 21-5: Preliminary Thermal Resistivity Testing Report
Appendix 21-6: Desktop Geotechnical Report
Appendix 22-1: Master Plant Inventory List
Appendix 22-2: Wetland and Waterbody Delineation Report Appendix 22-2: Wetland and Waterbody Delineation Report-_Waterbody Data Forms Appendix 22-2: Wetland and Waterbody Delineation Report_Wetland Data Forms Appendix 22-3: Invasive Species Control Plan Appendix 22-4: Master Wildlife Inventory List Appendix 22-5: 2016 Pre-Construction Avian and Bat Surveys Appendix 22-6: 2016 Pre-Construction Spring Migrating Bird Report Appendix 22-7: Phase 3 Bat Mist Net and Acoustic Survey Appendix 22-8: Habitat Assessment Memorandum Appendix 22-9: Habitat Fragmentation Memorandum Appendix 22-10: Cumulative Effects Analysis Appendix 22-11: Agency Consultation Packages Appendix 22-12: Wetland Functions and Values Assessment Appendix 22-13: NYSDAM Wind Farm Guidelines Appendix 23-1: NYSDEC Obtained Water Well Reports Appendix 23-2: NYSDEC FOIL Correspondence Appendix 23-3: Water Well Survey and Responses Appendix 23-4: Preliminary Stormwater Pollution Prevention Plan Appendix 23-5: Preliminary Spill Prevention, Control, and Countermeasure Plan Appendix 24-1: VIA Attachment 1 – Figure 7 Appendix 24-1: VIA Attachment 1 – Figure 8 Appendix 24-1: VIA Attachment 1 – Figures 1 through 6 Appendix 24-1: VIA Attachment 2 – Simulations Appendix 24-1: VIA Attachment 3 – Outreach Correspondence Appendix 24-1: VIA Attachment 4 – Visual Impact Rating Forms Appendix 24-1: Visual Impact Assessment VIA Appendix 25-1: Turbine Delivery Route Analysis Appendix 25-2: Public Road Study Appendix 25-3: Accident Summary Data 2014-2016 Appendix 25-4: School Bus Route Map Appendix 25-5: Summary of Expected Construction Vehicles Appendix 25-6: Airspace Analysis Appendix 25-7: Notice of Presumed Hazard and Public Notice circularization Appendix 26-1: AM and FM Radio Report Appendix 26-2: Off-Air TV Analysis Appendix 26-3: Mobile Phone Carrier Report Appendix 26-4: Microwave Study Appendix 26-5: Land Mobile and Emergency Services Report Appendix 26-6: Doppler Weather Radar Study Appendix 26-7: National Telecommunications and Information Administration Response Appendix 26-8: GPS Study Appendix 26-9: Amateur Radio Report Appendix 29-1: Decommissioning & Restoration Plan Appendix 31-1: Local Law No. 1 of 2017 Greenwood Wind Energy Facilities Appendix 31-2: Local Law No. 1 of 2017 West Union Wind Energy Facilities Appendix 31-3: Local Law No. 1 of 2012 West Union Land Use-Site Planning Appendix 34-1: Collection Line Structure Drawings Appendix 34-2: Transmission Line Structure Drawings Appendix 35-1: Electric and Magnetic Field Calculation Report